Trunkline Gas Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 09/01/1993, Docket: RS92- 25-001, Status: Effective
Original Sheet No. 60 Original Sheet No. 60 : Effective
RATE SCHEDULE NNS-1 (Continued)
NO NOTICE SERVICE
3. RATE
The rates and charges for firm service under this Rate
Schedule NNS-1 shall be as follows:
3.1 Reservation Charge
The monthly Reservation Charge shall be the product of
the MDWQ and the reservation rate per Dt as set forth
on the effective Tariff Sheet No. 11.
3.2 Injection Charge
The Injection Charge shall be the product of the
Quantity of Gas injected into storage, whether in
accordance with a nomination by Shipper or in
accordance with Section 2.2 of this Rate Schedule NNS-
1, during the Month, and the injection rate per Dt as
set forth on the effective Tariff Sheet No. 11.
3.3 Withdrawal Charge
The Withdrawal Charge shall be the product of the
Quantity of Gas withdrawn from storage, whether in
accordance with a nomination by Shipper or in
accordance with Section 2.2 of this Rate Schedule NNS-
1, during the Month, and the withdrawal rate per Dt as
set forth on the effective Tariff Sheet No. 11.
3.4 Range of Rates
Unless otherwise agreed to in writing between Shipper
and Trunkline, any rate applicable to Shipper for
service hereunder shall be the applicable Maximum Rate
per Dt as set forth on the effective Tariff Sheet No.
11, plus all applicable surcharges specified in the
General Terms and Conditions, as may be applicable from
time to time. If an amount less than the applicable
Maximum Rate and not less than the applicable Minimum
Rate is agreed upon in writing, such amount shall be
applied prospectively. Trunkline shall be responsible
for compliance with any reporting requirements
prescribed by the Commission. Trunkline shall not be
required to enter into any Service Agreement for No
Notice Service at a rate less than the Maximum Rate per
Dt.