Trunkline Gas Company

First Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 01/23/1999, Docket: RP99-191-000, Status: Effective

Third Revised Sheet No. 38 Third Revised Sheet No. 38 : Effective

Superseding: Second Revised Sheet No. 38

RATE SCHEDULE SST (Continued)

SMALL SHIPPER TRANSPORTATION

 

 

2.3 Service provided at the primary and secondary Points of Receipt

and primary Points of Delivery shall be provided on a firm basis

subject to the scheduling, curtailment and interruption provisions

of Sections 3 and 4 of the General Terms and Conditions.

 

2.4 Tolerance Level

 

The Tolerance Level under this Rate Schedule SST shall be ten

percent (10%). Daily scheduling variances in excess of the

Tolerance Level shall be subject to a daily scheduling penalty

calculated in accordance with Section 5 of the General Terms and

Conditions.

 

3. RATE

 

The rates and charges for firm service under this Rate Schedule SST

shall be as follows:

 

3.1 Usage Charge

 

(A) If both the primary Points of Receipt and primary Points of

Delivery, as set forth in the Rate Schedule SST Form of

Service Agreement, excluding Epps Storage Field points, are

located within the same Zone, the monthly Usage Charge shall

be the product of the actual Quantity of Gas delivered up to

Shipper's MDQ during the Month and the usage rate per Dt, as

determined by such primary points, for service within the

Zone, as set forth on the effective Tariff Sheet No. 7; and

 

(B) If the primary Points of Receipt and primary Points of

Delivery, as set forth in the Rate Schedule SST Form of

Service Agreement, excluding Epps Storage Field points, are

located in different Zones, then the monthly Usage Charge

shall be the product of the actual Quantity of Gas delivered

up to Shipper's MDQ during the Month and the usage rates per

Dt, as determined by such primary points, for service between

such Zones, as set forth on the effective Tariff Sheet No. 7.

 

3.2 Gathering Charge

 

If Shipper designates a Point of Receipt identified as a Gathering

Point of Receipt on the MRPL then, in addition to the Usage Charge

established in Section 3.1 of this Rate Schedule SST, Shipper

shall pay a monthly Gathering Charge which shall be the product of