Transwestern Pipeline Company
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/14/2003, Docket: RP03-307-000, Status: Effective
Fourth Revised Sheet No. 95I Fourth Revised Sheet No. 95I : Effective
Superseding: Substitute Third Revised Sheet No. 95I
GENERAL TERMS AND CONDITIONS
(continued)
30.9 General Terms and Conditions
a) Priority: All released capacity will have priority over
the Transporter's interruptible services.
b) Alternate Points: Alternate Receipt Points and Alternate
Delivery Points may be utilized by a Replacement Shipper as
described in Section 22 of the General Terms and Conditions
of this Tariff.
c) Rates: Releasing Shipper cannot release capacity for an
effective price less than Transporter's minimum rates nor
more than Transporter's just and reasonable maximum rates,
as set forth in Transporter's current FERC Gas Tariff. The
maximum rate that may be charged for capacity released is
the maximum firm rate which may be charged by Transporter
for such transportation, plus Transport Fuel and all
applicable surcharges.
In the event a Releasing Shipper elects to accept bids
containing a one-part rate, such rate shall include
the Reservation Charge, any reservation surcharges,
and the Usage charges. Bidders may only bid on the
Reservation Charge and the reservation surcharges
(herein referred to as the "One-part Rate Bid"). The
Usage Charges include the currently effective
commodity charge plus any applicable surcharges. The
maximum One-part Rate Bid must be calculated using the
projected applicable load factor underlying
Transporter's current rates and the following formula:
One-part Rate Bid = (Reservation Charge/Load Factor)
where: Reservation Charge = Currently effective
reservation charge, and
Load Factor = 100%
Such Reservation Charges and Usage Charges will be set
forth in Transporter's current FERC Gas Tariff, and
must comply with Section 284.8 of the Commission's
Regulations.
Releasing Shipper may specify dollars and cents or
percentages of the maximum tariff rate in the
denomination of bids.
Maximum and minimum rates specified by the Releasing
Shipper must include the Reservation Charge and all
demand surcharges.
d) Secondary/Subsequent Releases: Replacement Shipper, and
any third parties receiving capacity rights from any
Replacement Shipper, will be authorized or permitted to
release the capacity to other third parties only under the
same set of conditions described herein, i.e., any
Replacement Shipper will be considered the Releasing
Shipper for purposes of subsequent assignments of capacity,
and any third party receiving such capacity in such
transactions will be considered the Replacement Shipper.