RATE SCHEDULE LFT

Limited Firm Transportation Service

(continued)

 

 

(b) Except as provided in Section 3.2(c), Transporter shall attempt to schedule

maintenance of its facilities during months not enumerated under paragraph

3.2(a); however, if Transporter's deliveries of gas to Shipper during such

months of quantities nominated and confirmed (up to the aggregate MAXDTQ),

less Transport Fuel, fall below seventy-five percent (75%) of such

quantities for a period of seventy-five (75%) consecutive days, the

Reservation Charge applicable to such period shall be reduced and such

reduction shall be calculated as provided in Section 3.2(a)(i), (ii) and

(iii) above.

 

(c) The Reservation Charge reduction shall not, however, apply: (i) during

periods of unscheduled maintenance not to exceed ten (10) days in any

calendar quarter; (ii) during the occurrence of a "force majeure" event as

set forth in Section 11.1 of the General Terms and Conditions of this

Tariff (but only to the extent of such "force majeure"); (iii) to any

failure by Transporter to deliver volumes nominated and confirmed in

accordance with Section 22 of the General Terms and Conditions of this

Tariff up to the aggregate MAXDTQ, which is attributable to the fault

(including "force majeure") of Shipper or Shipper's suppliers; (iv) to the

extent the Maximum Reservation Charge is discounted to Shipper; and/or (v)

to the extent the volumes nominated and confirmed for delivery, less

Transport Fuel, in accordance with Section 22 of the General Terms and

Conditions of this Tariff (up to the aggregate MAXDTQ) exceeds actual

quantities delivered, less Transport Fuel, by five percent (5%) or less,

except as otherwise mutually agreed to by Shipper and Transporter.

Unscheduled maintenance shall mean unanticipated or unplanned maintenance

on the pipeline system required to be performed to ensure that gas

continues to flow in months other than December, January, February, July,

and August.

 

(d) The provisions of this Section 3.2 shall not apply to any Limited Day.

 

3.3 Transport Charge: For transportation of natural gas on Transporter's

system, the applicable Transport Charge for Rate Schedule LFT shall be multiplied

by the quantity of gas scheduled during the month. Except as provided for in

Section 3.5, the Maximum Transport Charge shall include (1) Maximum Transmission

Charge, as applicable, and (2) all applicable surcharges. In addition, Shipper

shall deliver, at the point of receipt under the LFT Service Agreement, Transport

Fuel, as set forth in the currently effective Rate Sheets of this Tariff.