Transwestern Pipeline Company
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 02/01/1993, Docket: RS92- 87-003, Status: Effective
1st Revised Sheet No. 12 1st Revised Sheet No. 12 : Effective
Superseding: Original Sheet No. 12
RATE SCHEDULE FTS-1
Firm Transportation Service
(continued)
In estimating the revenues to be generated, Transporter will consider
the existence of capacity limitations downstream of the proposed new
facilities, the marketability of gas which may flow through said
facilities, the interruptible versus firm nature of the
transportation service for the gas, and other similar factors which
determine whether gas will actually be transported through said
facilities. Based on these criteria, the economic value of a project
shall be determined using a discounted cash flow rate of return
methodology with the minimum acceptable rate of return to be
published on Transporter's Electronic Bulletin Board, as amended from
time-to-time.
(d) Transporter shall not construct or modify any facilities hereunder
which will result in an increase or decrease in Transporter's
mainline capacity, or which may compromise the operational integrity
of Transporter's pipeline system. For those facilities which
Transporter agrees to construct, Transporter will construct those
facilities (1) pursuant to the authorization granted in Subpart F of
Part 157 of the Regulations of the Federal Energy Regulatory
Commission or (2) where the prior authorization of the Federal
Energy Regulatory Commission is not required to construct such
facilities. Transporter will own and operate all facilities
constructed hereunder. To the extent Shipper's reimbursement of
Transporter's costs incurred to construct new facilities hereunder
qualifies as a contribution in aid of construction under the Tax
Reform Act of 1986, Pub. L. No. 99-514 (1986), as amended from
time-to-time, Shipper shall also reimburse Transporter for Federal
income taxes incurred by Transporter as a direct result of such
contributions in aid of construction by Shipper.
(e) Transporter shall have the right at any time during a calendar year
to terminate, prospectively for the remainder of that calendar year,
the reimbursement program described in Paragraph (c) above for new
projects.