Transwestern Pipeline Company

Second Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 09/01/1995, Docket: RP95-271-001, Status: Effective

4th Revised Sheet No. 9 4th Revised Sheet No. 9 : Effective

Superseding: 3rd Revised Sheet No. 9

 

 

RATE SCHEDULE FTS-1

Firm Transportation Service

(continued)

 

 

(b) Except as provided in Section 3.2(c), Transporter shall

attempt to schedule maintenance of its facilities during

months not enumerated under paragraph 3.2(a); however, if

Transporter's deliveries of gas to Shipper during such months

of quantities nominated and confirmed (up to the aggregate

MAXDTQ), less Transport Fuel, fall below seventy-five percent

(75%) of such quantities for a period of seventy-five

(75) consecutive days, the Reservation Charge

applicable to such period shall be reduced and such reduction

shall be calculated as provided in Section 3.2(a)(i), (ii) and

(iii) above.

 

(c) The Reservation Charge reduction shall not, however, apply:

(i) during periods of unscheduled maintenance not to exceed

ten (10) days in any calendar quarter; (ii) during the

occurrence of a "force majeure" event as set forth in Section

11.1 of the General Terms and Conditions of this Tariff (but

only to the extent of such "force majeure"); (iii) to any

failure by Transporter to deliver volumes nominated and

confirmed in accordance with Section 22 of the General Terms and

Conditions of this Tariff up to the aggregate MAXDTQ, which is

attributable to the fault (including "force majeure") of Shipper

or Shipper's suppliers; (iv) to the extent the Maximum

Reservation Charge is discounted to Shipper; and/or (v) to the

extent the volumes nominated and confirmed for delivery, less

Transport Fuel, in accordance with Section 22 of the General

Terms and Conditions of this Tariff (up to the aggregate MAXDTQ)

exceeds actual quantities delivered, less Transport Fuel, by

five percent (5%) or less, except as otherwise mutually agreed

to by Shipper and Transporter. Unscheduled maintenance shall

mean unanticipated or unplanned maintenance on the pipeline

system required to be performed to ensure that gas continues to

flow in months other than December, January, February, July, and

August.

 

3.3 Transport Charge: For transportation of natural gas on Transporter's

system, the applicable Transport Charge for Rate Schedule FTS-1 shall

be multiplied by the quantity of gas scheduled during the month.

Except as provided for in Section 3.5, the Maximum Transport Charge

shall include (1) Maximum Transmission Charge, as applicable, and (2)

all applicable surcharges. In addition, Shipper shall deliver, at the

point of receipt under the FTS-1 Service Agreement, Transport Fuel, as

set forth in the currently effective Rate Sheets of this Tariff.