Transwestern Pipeline Company
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 02/02/2001, Docket: RP97-288-010, Status: Suspended
Sixth Revised Sheet No. 5B.07 Sixth Revised Sheet No. 5B.07 : Suspended
Superseding: Fifth Revised Sheet No. 5B.05
6/ The total rate is $.50/MMBtu/day
7/ Point(s) of Receipt Point Name
---------------------------- -----------------
56498 Bloomfield Compressor
8/ Point(s) of Delivery Point Name
---------------------------- -----------------
56943 Valero Ward
9/ For any day volumes are scheduled during the month of
February 2001, the rate shall be as follows:
(a) Gas Daily, SoCal Large Pkgs Midpoint minus Gas
Daily, TW San Juan (Blanco) Midpoint minus Fuel
minus $.50.
(b) Gas Daily, SoCal Large Pkgs Midpoint minus Gas
Daily, El Paso Permian Midpoint minus Fuel minus
$.50.
10/ Point(s) of Receipt Point Name
---------------------------- -----------------
(a) 56498 Bloomfield Compressor
(b) 58646 West Texas Pool
11/ Point(s) of Delivery Point Name
---------------------------- -----------------
(a) 10487 SoCal Needles
(b) 10487 SoCal Needles
12/ (a) 10,000 MMBtu/day
(b) 5,000 MMBtu/day
13/ For any day volumes are scheduled during the period of
February 2, 2001 though February 28, 2001, the rate
shall be Gas Daily, SoCal Large Pkgs Midpoint minus Gas
Daily, El Paso Permian Midpoint minus Fuel times
50 percent.
14/ Point(s) of Receipt Point Name
---------------------------- -----------------
1190 Keystone Plant
15/ Point(s) of Delivery Point Name
---------------------------- -----------------
56690 Mojave Topock