Transwestern Pipeline Company
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 10/01/2004, Docket: RP04-490-000, Status: Effective
Twenty-Sixth Revised Sheet No. 5A.03 Twenty-Sixth Revised Sheet No. 5A.03 : Effective
Superseding: Twenty-Fifth Revised Sheet No. 5A.03
CURRENTLY EFFECTIVE TRANSPORTATION RATES
DELIVERED TO SAN JUAN
($/MMBTU)
MAXIMUM
FTS-1, LFT,
FTS-3 and EFBH FTS-1, LFT, MAXIMUM
RESERVATION FTS-3 and EFBH ITS-1 MAXIMUM
CHARGE COMMODITY COMMODITY FUEL%
----------- --------- --------- -------
(1)(9)(10) (2)(9) (6) (5)(7)(11)
RECEIPT POINT AREA:
EAST OF THOREAU: (3)(4)
BASE RATE $0.2040 $0.0082 $0.2122
APPLICABLE SURCHARGES(8) 0.0000 0.0019 0.0019
------- ------- -------
TOTAL RATE $0.2040 $0.0101 $0.2141 1.56%
WEST OF THOREAU:(3)(4)
BASE RATE $0.3659 $0.0164 $0.3823
APPLICABLE SURCHARGES(8) 0.0000 0.0019 0.0019
------- ------- -------
TOTAL RATE $0.3659 $0.0183 $0.3842 4.75%
SAN JUAN:(3)(4) (a)
BASE RATE $0.1020 $0.0011 $0.1031
APPLICABLE SURCHARGES(8) 0.0000 0.0019 0.0019
------- ------- -------
TOTAL RATE $0.1020 $0.0030 $0.1050 0.25%
Footnotes
(a) Includes receipts from the Thoreau/San Juan Point.
NOTE: All numeric Footnotes referenced on Sheet Nos. 5B through 5B.03 of this Tariff.