Transwestern Pipeline Company
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 10/01/2004, Docket: RP04-490-000, Status: Effective
Twenty-Sixth Revised Sheet No. 5A.02 Twenty-Sixth Revised Sheet No. 5A.02 : Effective
Superseding: Twenty-Fifth Revised Sheet No. 5A.02
CURRENTLY EFFECTIVE TRANSPORTATION RATES
DELIVERED TO EAST OF THOREAU (a)
($/MMBTU)
MAXIMIM
FTS-1, LFT, MAXIMUM
FTS-3 and EFBH FTS-1, LFT,
RESERVATION FTS-3 and EFBH ITS-1 MAXIMUM
CHARGE COMMODITY COMMODITY FUEL%
----------- ---------- --------- ----------
(1)(9) (2)(9) (6) (5)(7)(11)
RECEIPT POINT AREA:
EAST OF THOREAU: (b)(3)(4)
BASE RATE $0.1020 $0.0071 $0.1091
APPLICABLE SURCHARGES (8) 0.0000 0.0019 0.0019
------- ------- -------
TOTAL RATE $0.1020 $0.0090 $0.1110 1.31%
WEST OF THOREAU:(3)(4)
BASE RATE $0.3659 $0.0224 $0.3883
APPLICABLE SURCHARGES (8) 0.0000 0.0019 0.0019
------- ------- -------
TOTAL RATE $0.3659 $0.0243 $0.3902 5.81%
SAN JUAN:(3)(4)
BASE RATE $0.2040 $0.0082 $0.2122
APPLICABLE SURCHARGES (8) 0.0000 0.0019 0.0019
------- ------- -------
TOTAL RATE $0.2040 $0.0101 $0.2141 1.56%
Footnotes
(a) These rates will be applicable to all delivery points east of Thoreau/San Juan Point
except for deliveries to the Thoreau/San Juan Point.
(b) Includes receipts from the Thoreau/San Juan Point.
NOTE: All numeric Footnotes referenced on Sheet Nos. 5B through 5B.03 of this Tariff.