Transwestern Pipeline Company

Second Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 10/01/2004, Docket: RP04-490-000, Status: Effective

129th Revised Sheet No. 5 129th Revised Sheet No. 5 : Effective

Superseding: 128th Revised Sheet No. 5

CURRENTLY EFFECTIVE TRANSPORTATION RATES

DELIVERED TO CALIFORNIA

($/MMBTU)

 

MAXIMUM

FTS-1, LFT,

FTS-3 and EFBH FTS-1, LFT, MAXIMUM

RESERVATION FTS-3 and EFBH ITS-1 MAXIMUM

CHARGE COMMODITY COMMODITY FUEL%

----------- --------- --------- --------

(1)(9)(10) (2)(9) (6) (5)(7)(11)

RECEIPT POINT AREA:

 

EAST OF THOREAU:(3)(4)

 

BASE RATE $0.3453 $0.0224 $0.3677

APPLICABLE SURCHARGES (8) 0.0000 0.0019 0.0019

------- ------- -------

TOTAL RATE $0.3453 $0.0243 $0.3696 5.00%

 

WEST OF THOREAU: (a)(3)(4)

 

BASE RATE $0.2639 $0.0153 $0.2792

APPLICABLE SURCHARGES (8) 0.0000 0.0019 0.0019

------- ------- -------

TOTAL RATE $0.2639 $0.0172 $0.2811 4.50%

 

SAN JUAN:(3)(4)

 

BASE RATE $0.3659 $0.0164 $0.3823

APPLICABLE SURCHARGES (8) 0.0000 0.0019 0.0019

------- ------- -------

TOTAL RATE $0.3659 $0.0183 $0.3842 4.75%

 

 

 

 

 

 

 

 

 

Footnotes

 

(a) Includes receipts from the Thoreau/San Juan Point.

 

 

NOTE: All numeric footnotes referenced on Sheet Nos. 5B through 5B.03 of this Tariff.