TransColorado Gas Transmission Company
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 09/01/2002, Docket: RP02-398-000, Status: Effective
Third Revised Sheet No. 247A Third Revised Sheet No. 247A : Superseded
Superseding: Substitute Second Revised Sheet No. 247A
GENERAL TERMS AND CONDITIONS
12. BALANCING OF GAS (Continued)
(1) Projected transmission system losses or gains
and unaccounted-for quantities will be calculated by subtracting the
physical transmission deliveries for the month, two months previous to the
projected month, including actual system gas consumed, from corresponding
physical transmission receipts as adjusted for anticipated changes in
system operations.
(2) Projected monthly scheduled Phase I and II
transportation receipt quantities. Projected monthly scheduled
transportation receipts will be based on the scheduled Phase I and Phase
II transmission receipt quantities for the month, two months previous to
the projected month, as adjusted for anticipated changes in system
operations.
(ii) Projected monthly system gas consumption.
Projected transmission system gas consumption will be based on the actual
fuel consumed at each compressor station, extraction plant or other fuel
consuming facility for the month, two months previous to the projected
month, as adjusted for anticipated changes in system operations divided by
projected monthly scheduled Phase II transportation receipt quantities.
Projected monthly scheduled transportation receipts will be based on the
scheduled transmission receipt quantities for the month, two months
previous to the projected month, as adjusted for anticipated changes in
system operations (excluding any quantities associated with the
transactions listed under § 12.9(d).
(iii) Phase I and Phase II transportation identified in
§ 12.9(d) prior 12 months ending December 31 variance adjustment. The
variance adjustment for each 12 months ending December 31 shall be: the
sum of Phase I and § 12.9(d) shippers' proportionate share of the 12
months' lost or gained and unaccounted-for quantities, less the sum of the
12 months' Phase I and § 12.9(d) shippers'FGRP quantity collected, as
adjusted to exclude the variance adjustment component of the FGRP plus the
unamortized balance of the prior April 1 through March 31 amortization
period; all divided by actual Phase I and § 12.9(d) shippers=annual
transportation volumes for the 12 months ended December 31, as adjusted
for anticipated changes in system operations. Monthly variances will be
accumulated in the appropriate accounts. The variance adjustment
component of the FGRP will be used to amortize the previous 12 months
ended December 31 variance account balance over the 12-month period April
1 through March 31.
(iv) Phase II prior 12 months ending December 31
variance adjustment. The Phase II variance adjustment for each 12 months
ending December 31 shall be: the sum of the 12 months' actual monthly gas
consumption and lost or gained and unaccounted-for quantities; less the