TransColorado Gas Transmission Company

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 11/01/2002, Docket: RP97-255-053, Status: Effective

Thirtieth Revised Sheet No. 22 Thirtieth Revised Sheet No. 22 : Superseded

Superseding: Twenty-Ninth Revised Sheet No. 22

Footnotes

1/ This contract does not deviate in any material aspect from the form of

service agreement.

2/ Shipper shall also pay the applicable ACA usage surcharge.

3/ The rate will contain a floor of $0.10 and a ceiling of $0.30. The

monthly rate will be based on the Inside FERC's Gas Market Report, first

of the month index for El Paso Natural Gas Co., San Juan Basin:

Index: Rate Index: Rate

Less than $1.50 $0.10 $2.30 to $2.49 $0.22

$1.50 to $1.69 $0.12 $2.50 to $2.69 $0.26

$1.70 to $1.89 $0.14 $2.70 to $2.89 $0.28

$1.90 to $2.09 $0.18 $2.90 and above $0.30

$2.10 to $2.29 $0.20

4/ This transportation service to be provided solely from a receipt point

to be established in San Miguel and/or Montrose County, Colorado, to

primary delivery points of El Paso Natural gas or Transwestern pipelines

in San Juan County, Blanco, New Mexico.

5/ This information is set out in the executed service agreement currently

on file with the FERC. The service agreement deviates from the form of

service agreement found in TransColorado's FERC Gas Tariff.

6/The Shipper's reservation charge is based on a fifty-percent load

factor. This requires the Shipper to pay a reservation charge on the

first 25,000 Dth per day multiplied by the number of days in the month,

regardless of flow. Once Shipper has satisfied the 50% load factor in any

month, the Shipper is only required to pay a transportation charge on the

volumes that flow. Shipper's reservation charge for the first 2,500,000

Dth transported will be $0.15/Dth ($4.5625 x 12 ö 365). At 2,500,001 Dth,

the Shipper's reservation charge will be reduced to $0.04/Dth ($1.2167 x

12 ö 365).

 

To the extent that the Southern Ute Tribe imposes any throughput fees for

operation of the supply lateral from the Antler Plant or an increase in

ROW fees, any such fees shall be borne by Shipper and shall be reimbursed

by Shipper to TransColorado.

 

7/Shipper's reservation charge is based on a thirty percent load factor.

This requires the shipper to pay a reservation charge of $0.25/Dth ($7.6042

x 12 ö 365) on the first 136,800 Dth per month, regardless of flow. At

136,801 Dth or more, the shipper is only required to pay this reservation

charge on volumes that flow.