Texas Gas Transmission Corporation

First Revised Volume No. 2-A

 Contents / Previous / Next / Main Tariff Index



Effective Date: 01/01/1993, Docket: RP90-104-020, Status: Effective

Original Sheet No. 128 Original Sheet No. 128 : Effective





28.6 Measurement Base


The measurement base shall be that which is appli-

cable to the underlying service agreement with the

applicable Upstream Pipeline.


28.7 Other Conditions:


(a) Transporter is not authorized to permanently

assign any rights under this program.


(b) Transporter and other interstate pipelines that

participate in the program, and their respective

affiliates, shall comply with the requirements

of Order No. 497 for these transactions, as long

as Order No. 497 is in effect.


28.8 Reporting Requirements:


Transporter is required to file the following infor-

mation with the Commission every 60 days during the

first 6 months of the program, quarterly during the

next 18 months of the program, and annually there-



(a) the name, address and telephone number of the



(b) the corporate affiliation between Transporter

and the assignee:


(c) a description of the specific rights brokered,

including term, receipt and delivery points and



(d) the Docket Number under which the Commission

authorized Transporter to broker;


(e) the identity of the Upstream Pipeline.