Sea Robin Pipeline Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/1999, Docket: RP99-374-000, Status: Effective
Fifth Revised Sheet No. 25 Fifth Revised Sheet No. 25 : Superseded
Superseding: Fourth Revised Sheet No. 25
GENERAL TERMS AND CONDITIONS
(Continued)
3.5 (continued)
Transporter shall have the right to allocate that portion of the commingled stream to
Shipper, or for its account, attributable to the transportation service provided under the
Agreement.
3.6 (a) Use of PDAs: On a daily basis at each Delivery Point, Transporter
shall allocate any variances between scheduled nominations and the quantities of gas metered at the
point among the quantities of gas scheduled at the point for the account of its SHIPPERS based on
the Pro Rata PDA method unless another PDA method is provided by the party that owns or
operates the downstream facilities interconnecting with Transporter's facilities at each
Delivery Point (the "downstream operator"). The alternate PDA methodologies from which
the downstream operator may choose include the Swing PDA, a Ranked PDA, a Percentage PDA,
or any other mutually agreeable allocation methodology. A new allocation detail may be
needed when a nomination changes. The PDA shall be provided by the downstream operator
on a line item basis at the level of nomination detail provided by Transporter for
confirmation. Transporter shall then use the predetermined priority provided by
SHIPPER in its nomination for applying the PDA to the Package ID level within the line
item nomination level. SHIPPER agrees that Transporter shall have the right to
rely conclusively on the PDA provided pursuant to this Section 3.6 for the purpose of
determining the daily quantities of gas delivered by Transporter for the account of SHIPPER at
each Delivery Point.
(b) PDA Deadlines: Each PDA must be submitted to Transporter
by facsimile machine or through SoNet Premier during the confirmation of that day's nominations
or after confirmation but prior to start of gas day; provided that any revisions to the
PDA may be made by the downstream operator during the confirmation period on the day of
flow for intraday nomination changes. If there are no additions in nominations by a SHIPPER at
a Delivery Point or other changes, the current PDA will stay in effect as submitted until it is
changed pursuant to the foregoing procedures. In the event SHIPPER adds a nomination at a
Delivery Point, then SHIPPER must provide, or cause to be provided, as set forth above a PDA
at the Delivery Point which recognizes the SHIPPER'S nomination.