GENERAL TERMS AND CONDITIONS
(Continued)
3.3 (continued)
from the previously approved design or material specifications. Transporter shall also
have the right to inspect such facilities during construction.
3.4 For each Delivery Point, Transporter and Shipper shall specify on Exhibit
B to the FTS or FTS-2 Service Agreement the MDQ to be delivered to or for the account of
Shipper at said point. For service
performed under the FTS or FTS-2 Rate Schedule, the sum of the MDQs specified on the Exhibit
B to the Agreement shall not exceed the total MDQ specified in the Agreement. Shippers
with an FTS or FTS-2 Agreement may also have the right to utilize as an alternate Delivery
Point on a preferred interruptible basis all active Delivery
Point/s on Transporter's contiguous System at which interruptible capacity is available,
as posted by Transporter or SoNet. These alternate Delivery Points ("Exhibit B-1 Delivery
Points") shall have a priority subordinate to firm services utilizing said points as Exhibit
B Delivery Points and a priority superior to all services utilizing said points on an
interruptible basis.
For service performed under the ITS Rate Schedule, Transporter shall maintain on SoNet a
list (Delivery Point List)
of all Delivery Points/s on Transporter's contiguous system at which interruptible
capacity is available. For each B-1 Delivery Point
and Delivery Point to the ITS Agreement, the MDQ at said point shall be
considered to be the lesser of (i) the total MDQ specified in the
Agreement, or scheduled quantity, as applicable or (ii) the maximum quantity of gas
Transporter is capable of delivering at
said point as determined by Transporter from time to time.
For service performed under the FTS or FTS-2 Rate Schedule, Transporter and Shipper
may add or delete points to Exhibit B to the Agreement or change the MDQ for any
Delivery Point on Exhibit B by executing a revised Exhibit B to the Agreement,
provided, however, that any such change to an Exhibit B must include corresponding
changes to the existing MDQs such that the sum of the changed MDQs shall not exceed
the total MDQ specified in the Agreement and provided further that any such change
shall be subject to the availability of capacity at the requested points.
Any addition or deletion of Delivery Point/s to the Delivery Point List
shall automatically be incorporated
into the Agreements.
3.5 It is understood that gas delivered to Shipper, or for Shipper's account,
at the Transporter Delivery Point/s may be delivered in a commingled stream and