Sea Robin Pipeline Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/01/1998, Docket: RP98-365-000, Status: Effective
Second Revised Sheet No. 18 Second Revised Sheet No. 18 : Superseded
Superseding: First Sub. First Revised Sheet No. 18
GENERAL TERMS AND CONDITIONS
(Continued)
2.2 (continued)
Transporter has tendered such billings to Shipper pursuant to this Section. Late
payments shall be subject to Section 8 of these General Terms and Conditions.
In the event that Transporter agrees to permit Shipper at Shipper's expense to
install measurement and pipeline facilities at the Transporter Receipt Point/s,
Transporter shall have the right to review and approve, prior to installation, design and
material specifications for such facilities. Transporter shall also have the right to inspect
such facilities during construction and halt construction if (i) the construction is
performed in a manner inconsistent with approved practices or could damage
Transporter's facilities or (ii) the construction or materials deviate from the previously
approved design or material specifications.
2.3 For each receipt point listed on Exhibit A to the FTS or FTS-2 Service Agreement,
Transporter
and Shipper shall specify on said Exhibit A the MDQ to be delivered for transportation
at said point. For service performed under the FTS or FTS-2 Rate Schedule, the sum of the
MDQs specified on the Exhibit A to the Agreement shall not exceed the total MDQ
specified in the Agreement. Additionally, Shippers with an FTS or FTS-2 Agreement shall also
have the right to utilize as alternate Receipt Points on a preferred interruptible basis
all active Receipt Point/s on
Transporter's contiguous System at which interruptible capacity is available, as posted by
Transporter on SoNet. These alternate Receipt Points ("Exhibit A-1 Receipt Points") shall
have a priority subordinate to firm services utilizing said points as Exhibit A Receipt Points
and a priority superior to all services utilizing said points on an interruptible basis. For
service
performed under the ITS Rate Schedule and a Liquefiables Transportation Agreement, Transporter
shall maintain a list ("Receipt Point List") of
all Receipt Point/s on Transporter's
contiguous system available for Shipper's interruptible transportation service, which shall
be posted by Transporter on SoNet. For each A-1
Receipt Point and Receipt Point
to the ITS
Agreement and Liquefiables Transportation Agreement, the MDQ at said point shall be
considered to be the lesser of (i) the total MDQ
specified in the Agreement, or scheduled quantity, as applicable or (ii) the maximum
quantity of gas Transporter is capable of
receiving at said point as determined by Transporter from time to time.
For service performed under the FTS or FTS-2 Rate Schedule, Transporter and Shipper
may add or delete points to Exhibit A to the Agreement or change the