Sea Robin Pipeline Company

First Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 12/01/1998, Docket: RP98-365-000, Status: Effective

Second Revised Sheet No. 18 Second Revised Sheet No. 18 : Superseded

Superseding: First Sub. First Revised Sheet No. 18

GENERAL TERMS AND CONDITIONS

(Continued)

 

2.2 (continued)

 

Transporter has tendered such billings to Shipper pursuant to this Section. Late

payments shall be subject to Section 8 of these General Terms and Conditions.

 

In the event that Transporter agrees to permit Shipper at Shipper's expense to

install measurement and pipeline facilities at the Transporter Receipt Point/s,

Transporter shall have the right to review and approve, prior to installation, design and

material specifications for such facilities. Transporter shall also have the right to inspect

such facilities during construction and halt construction if (i) the construction is

performed in a manner inconsistent with approved practices or could damage

Transporter's facilities or (ii) the construction or materials deviate from the previously

approved design or material specifications.

 

2.3 For each receipt point listed on Exhibit A to the FTS or FTS-2 Service Agreement,

Transporter

and Shipper shall specify on said Exhibit A the MDQ to be delivered for transportation

at said point. For service performed under the FTS or FTS-2 Rate Schedule, the sum of the

MDQs specified on the Exhibit A to the Agreement shall not exceed the total MDQ

specified in the Agreement. Additionally, Shippers with an FTS or FTS-2 Agreement shall also

have the right to utilize as alternate Receipt Points on a preferred interruptible basis

all active Receipt Point/s on

Transporter's contiguous System at which interruptible capacity is available, as posted by

Transporter on SoNet. These alternate Receipt Points ("Exhibit A-1 Receipt Points") shall

have a priority subordinate to firm services utilizing said points as Exhibit A Receipt Points

and a priority superior to all services utilizing said points on an interruptible basis. For

service

performed under the ITS Rate Schedule and a Liquefiables Transportation Agreement, Transporter

shall maintain a list ("Receipt Point List") of

all Receipt Point/s on Transporter's

contiguous system available for Shipper's interruptible transportation service, which shall

be posted by Transporter on SoNet. For each A-1

Receipt Point and Receipt Point

to the ITS

Agreement and Liquefiables Transportation Agreement, the MDQ at said point shall be

considered to be the lesser of (i) the total MDQ

specified in the Agreement, or scheduled quantity, as applicable or (ii) the maximum

quantity of gas Transporter is capable of

receiving at said point as determined by Transporter from time to time.

 

For service performed under the FTS or FTS-2 Rate Schedule, Transporter and Shipper

may add or delete points to Exhibit A to the Agreement or change the