Pacific Gas Transmission Company

First Revised Volume No. 1-A

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 04/01/1999, Docket: RP99-248-001, Status: Effective

Substitute Third Revised Sheet No. 119 Substitute Third Revised Sheet No. 119 : Effective

Superseding: Second Revised Sheet No. 119

TRANSPORTATION GENERAL TERMS AND CONDITIONS

(Continued)

 

29. FLEXIBLE RECEIPT AND DELIVERY POINTS

 

29.1 Firm Service

 

(a) Addition of a Receipt Point

 

Any firm Shipper receiving service under Part 284 of the

Commission's regulations is entitled to use the receipt

point specified in its service agreement as a primary

receipt point. A firm Shipper may add a secondary

receipt point at any time during the life of the contract

provided that secondary receipt point is within the

Shipper's Primary Path.

 

Firm Shippers who are billed under a reservation charge

and a delivery rate will continue to be billed

reservation charges based on the primary receipt point

while delivery rates, including fuel, will be calculated

on the receipt point actually used.

 

To the extent additional meter station capacity or other

facilities are required to effect the receipt point

change, PG&E GT-NW will construct the additional capacity

consistent with Paragraph 18.5.

 

(b) Changing a Receipt Point

 

A firm Shipper may change primary receipt points to a

different receipt point within its Original Primary Path

but will continue to be billed reservation charges based

on the original primary receipt point. A firm shipper may

not change its Primary Receipt Point to a location that

would change the direction of flow of the shipper's

Primary Path as defined in Section 1.31 of this Gas Tariff.

Changes in primary receipt points will be permitted

provided sufficient receipt point capacity exists at the

receiving meter station and subject to any operating

constraints. To the extent additional meter station

capacity or other facilities are required to effect the

receipt point change, PG&E GT-NW will construct the

additional capacity at the firm Shipper's expense

consistent with Paragraph 18.5.

(Continued)