Pacific Gas Transmission Company
First Revised Volume No. 1-A
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/2001, Docket: RP01-400-000, Status: Effective
Third Revised Sheet No. 102 Third Revised Sheet No. 102 : Effective
Superseding: Second Revised Sheet No. 102
TRANSPORTATION GENERAL TERMS AND CONDITIONS
(Continued)
28. CAPACITY RELEASE (Continued)
28.7 Allocation of Parcels (Continued)
(a) Primary Allocation (Continued)
R = Rate or charge calculated as: The applicable
maximum authorized reservation charge(s) per Dth (or
a volumetric equivalent of the maximum reservation
charge(s) applicable to the Parcel on a 100% load
factor basis) in effect at the time of the bid for
service from the same receipt point to the same
delivery point under the Releasing Shipper's rate
schedule.
i = FERC's annual interest rate divided by 12.
n = number of periods for which the bidder wishes to
contract, not to exceed the maximum periods to be
released by the Releasing Shipper. For releases
greater than or equal to one month, the period is the
number of months. For releases less than one month
the period is the number of days.
A bid queue will be maintained for each individual
Parcel.
Option 3 - Net Revenue. Bids will be given priority
based on the net revenue for the term of the bid.
(Continued)