Pacific Gas Transmission Company
First Revised Volume No. 1-A
Contents / Previous / Next / Main Tariff Index
Effective Date: 03/27/2002, Docket: RP02-164-000, Status: Effective
Third Revised Sheet No. 96 Third Revised Sheet No. 96 : Effective
Superseding: Second Revised Sheet No. 96
TRANSPORTATION GENERAL TERMS AND CONDITIONS
(Continued)
28. CAPACITY RELEASE (Continued)
28.6 Bidding for a Parcel
(a) Preliminary Qualification
Replacement Shippers are encouraged to pre-qualify in
advance of any postings on PG&E GT-NW's EBB as credit
requirements will take differing amounts of time to
process depending on the particular financial profile
of Replacement Shippers. The pre-qualification process
will authorize a pre-set maximum monthly financial
exposure level for the Replacement Shipper. Such
exposure levels may be adjusted by PG&E GT-NW
periodically re-evaluating a Replacement Shipper's
credit-worthiness.
Releasing Shippers may exercise their option to waive
the credit requirements for any Replacement Shipper
wishing to bid on a Parcel posted by that Releasing
Shipper. Such waiver must be made on a nondiscriminatory
basis. PG&E GT-NW must be informed of such waiver via
the EBB before it will authorize such Replacement
Shipper's participation with respect to that particular
Parcel. In this instance, no pre-set maximum monthly
financial exposure level is applicable.
Should a Releasing Shipper waive the credit requirements
for a Replacement Shipper, the Releasing Shipper shall
be liable for all charges incurred by the Replacement
Shipper in the event such Replacement Shipper defaults
on payment to PG&E GT-NW for such capacity release
service.
(Continued)