Pacific Gas Transmission Company
First Revised Volume No. 1-A
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/1999, Docket: RP99-399-001, Status: Effective
Fourth Revised Sheet No. 54A Fourth Revised Sheet No. 54A : Effective
Superseding: Third Revised Sheet No. 54A
TRANSPORTATION GENERAL TERMS AND CONDITIONS
(Continued)
1. DEFINITIONS (Continued)
1.23 Extension Facilities: The term "Extension Facilities"
shall mean the 12-inch mains and appurtenant facilities
extending from PG&E GT-NW's mainline facilities at Milepost
304.25 and the 16-inch and 12-inch mains and appurtenant
facilities extending from PG&E GT-NW's Mainline Facilities
at Milepost 599.20 that were authorized in Docket
No. CP93-618-000. The term "Extension Facility" shall mean
one of the Extension Facilities.
1.24 Subject Shipper: The term "Subject Shipper" shall mean the
Shippers identified in Appendix G of the Stipulation and
Agreement in Docket No. RP94-149-000, et al., and Shippers
that have obtained service rights from such Shippers.
1.25 Nominations: A "Nomination" shall be the provision of
information to PG&E GT-NW necessary to effectuate a
transportation transaction. Specific Nomination procedures
are set forth in Section 19.4 of the General Terms and
Conditions of Transporter's FERC Gas Tariff.
1.26 Intraday Nomination: An "Intraday Nomination" is a
Nomination submitted after the Nomination deadline whose
effective time is no earlier than the beginning of the Gas
Day and runs through the end of the Gas Day.
1.27 Gas Industry Standards Board Standards: The term "Gas
Industry Standards Board Standards" or "GISB Standards"
shall mean the standardized business practices and
electronic communication practices promulgated by the Gas
Industry Standards Board from time to time and incorporated
in the Code of Federal Regulations by the Federal Energy
Regulatory Commission.
1.28 CES Capacity: The term "CES Capacity" shall mean the
additional firm capacity on PG&E GT-NW's Mainline Facilities
between the northernmost point near Kingsgate, British
Columbia, and points downstream thereof that was made
available for subscription on a firm basis as a result
of the expansion of PG&E GT-NW's system authorized in Docket
No. CP98-167.