Pacific Gas Transmission Company

First Revised Volume No. 1-A

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 03/27/2002, Docket: RP02-164-000, Status: Effective

Original Sheet No. 21 Original Sheet No. 21 : Effective

Superseding: No. 21

RATE SCHEDULE LFS-1

LIMITED FIRM TRANSPORTATION SERVICE

(Continued)

3. RATES (Continued)

 

3.3 Extension Charge (Continued)

 

(a) The reservation component of the Extension Charge shall

be the product of the Daily Extension Reservation Rate

(equal to the currently effective Extention Reservation

Rate as set forth on Effective Tariff Sheet No. 4 divided

by the number of days in the month), the number of days

in the month less the number of Limited Days, the distance

in pipeline miles from the Receipt Point(s) to the Primary

Point(s) of delivery on the Extension Facility as set

forth in Shipper's Contract, and the Shipper's Maximum

Daily Quantity at such Point(s). To the extent service

is provided for a Partial Volume Day, an LFS shipper’s MDQ

for that day will be equal to its contractual MDQ

multiplied by the ratio of the daily LFS quantity made

available to the shipper’s contractual MDQ.

 

(b) The delivery component of the Extension Surcharge shall

be the product of the quantities delivered at the point(s)

of delivery on the Extension Facility, the applicable

Extension delivery rate as set forth on Effective Tariff

Sheet No. 4, and the distance, in pipeline miles, from

the Receipt Point(s) on the Extension Facility to the

point(s) of delivery.

 

3.4 Authorized Overrun Charge

 

Quantities in excess of Shipper's MDQ shall be transported when

capacity is available on the PG&E GT-NW system and when the

provision of such Authorized Overruns shall not effect any

Shipper's rights on the PG&E GT-NW System. Authorized Overruns

are interruptible in nature. The rate charged shall be the same

as the rates and charges for interruptible transportation under

Rate Schedule ITS-1 as set forth on effective tariff Sheet No. 4,

and such Authorized Overruns shall be subject to the priority of

service provisions of Paragraph 19 of the Transportation General

Terms and Conditions.

 

3.5 Applicability of Surcharges

 

Shipper shall pay all reservation and usage surcharges

applicable to the service provided to such Shipper as set forth

in PG&E GT-NW's FERC Gas Tariff, First Revised Volume No. 1-A.

such surcharges shall be deemed to be part of Shipper's

reservation and Delivery Charges. (Continued)