Pacific Gas Transmission Company
First Revised Volume No. 1-A
Contents / Previous / Next / Main Tariff Index
Effective Date: 02/02/1998, Docket: GT98- 17-000, Status: Effective
Third Revised Sheet No. 14 Third Revised Sheet No. 14 : Effective
Superseding: Second Revised Sheet No. 14
RATE SCHEDULE FTS-1
FIRM TRANSPORTATION SERVICE
(Continued)
3. RATES (Continued)
3.3 Extension Charge
If Shipper designates a Primary Point of delivery on an
Extension Facility, then in addition to all other charges that
are applicable, Shipper shall pay the Extension Charge, which
shall consist of a reservation and delivery component.
(a) The reservation component of the Extension Charge shall
be the product of Shipper's Maximum Daily Quantity at the
Primary Point(s) of delivery on the Extension Facility,
the applicable Extension reservation rate as set forth on
Effective Tariff Sheet No. 4, and the distance, in
pipeline miles, from the Receipt Point(s) on the
Extension Facility to the Primary Point(s) of delivery.
(b) The delivery component of the Extension Surcharge shall
be the product of the quantities delivered at the
point(s) of delivery on the Extension Facility, the
applicable Extension delivery rate as set forth on
Effective Tariff Sheet No. 4, and the distance, in
pipeline miles, from the Receipt Point(s) on the
Extension Facility to the point(s) of delivery.
3.4 Authorized Overrun Charge
Quantities in excess of Shipper's MDQ shall be transported when
capacity is available on the PG&E GT-NW system and when the
provision of such Authorized Overruns shall not effect any
Shipper's rights on the PG&E GT-NW System. Authorized Overruns
are interruptible in nature. The rate charged shall be the same
as the rates and charges for interruptible transportation under
Rate Schedule ITS-1 as set forth on effective tariff Sheet No. 4,
and such Authorized Overruns shall be subject to the priority of
service provisions of Paragraph 19 of the Transportation General
Terms and Conditions.
3.5 Applicability of Surcharges
Shipper shall pay all reservation and usage surcharges
applicable to the service provided to such Shipper as set forth
in PG&E GT-NW's FERC Gas Tariff, First Revised Volume No. 1-A.
such surcharges shall be deemed to be part of Shipper's
reservation and Delivery Charges.
(Continued)