Pacific Gas Transmission Company
First Revised Volume No. 1-A
Contents / Previous / Next / Main Tariff Index
Effective Date: 01/01/2001, Docket: RP01-153-000, Status: Suspended
Twenty-Fifth Revised Sheet No. 5 Twenty-Fifth Revised Sheet No. 5 : Suspended
Superseding: Substitute Twenty-Fourth Revised Sheet N
STATEMENT OF EFFECTIVE RATES AND CHARGES
FOR TRANSPORTATION OF NATURAL GAS
Notes:
(a) The mileage component shall be applied per pipeline mile to gas
transported by PG&E GT-NW for delivery to shipper based on the
primary receipt and delivery points in Shipper's contract. Consult
PG&E GT-NW's system map on Sheet 3 for receipt and delivery point and
milepost designations.
(b) The non-mileage component is applied per Shipper's MDQ at Primary
Point(s) of Delivery on Mainline Facilities.
(c) The delivery rates are applied per pipeline mile to gas transported by
PG&E GT-NW for delivery to shipper based on distance of gas
transported. Consult PG&E GT-NW's system map on Sheet No. 3 for
receipt and delivery point and milepost designations.
(d) Fuel Use: Shipper shall furnish gas used for compressor station fuel,
line loss, and other utility purposes, plus other unaccounted-for gas
used in the operation of PG&E GT-NW's combined pipeline system in an
amount equal to the sum of the current fuel and line loss
percentage and the fuel and line loss percentage surcharge in
accordance with Paragraph 37 of this tariff, multiplied by the
distance in pipeline miles transported from the receipt point to the
delivery point multiplied by the transportation quantities of gas
received from Shipper under these rate schedules. The current fuel and
line loss percentage shall be adjusted each month between the maximum
rate of 0.0041% per Dth per pipeline mile and the minimum rate of
0.0000% per Dth per mile. The fuel and line loss percentage surcharge
is 0.0012% per Dth per pipeline mile. No fuel use charges will be
assessed for backhaul service.
(e) The MRRS Surcharge applies to Subject Shippers pursuant to Paragraph
3.1(c) of Rate Schedule FTS-1 and Article IV, Section 1(c) of the
Stipulation and Agreement in Docket No. RP94-149-000.
(f) Applicable to firm service on PG&E GT-NW's Medford Extension.
(Continued)