Overthrust Pipeline Company
First Revised Volume No. 1-A
Contents / Previous / Next / Main Tariff Index
Effective Date: 10/01/1997, Docket: RP97-507-000, Status: Effective
First Revised Sheet No. 56 First Revised Sheet No. 56 : Superseded
Superseding: Original Sheet No. 56
received by Overthrust and may not be withdrawn by the
bidding Shipper.
(b) The bidding Shipper's bid must include all
information included in 7 of these General Terms and
Conditions.
9.4 Overthrust shall not be obligated to accept any
bid for the capacity at less than the maximum applicable
tariff rate or for a term greater than 20 years. Upon
acceptance of a bid, Overthrust shall inform the existing
Shipper of the terms of the bid to permit Shipper to
exercise its right of first refusal. A Shipper exercising
its right of first refusal must match the highest bid but
only up to the maximum term of five years. The existing
Shipper shall have five days to inform Overthrust that it
agrees to match the bid.
If the existing Shipper notifies Overthrust that it
elects to match the terms of price and duration of the
accepted bid, Overthrust shall contract with the existing
Shipper. If the existing Shipper does not elect to match
the terms of the replacement Shipper's bid, Overthrust will
contract with the replacement Shipper according to the terms
and conditions of the tariff.
9.5 If no bids are received and the existing Shipper
is willing to pay the maximum rate, the existing Shipper
will be entitled to continue to receive service for whatever
term it chooses. At the end of the term, the existing
Shipper may again exercise its right of first refusal to
retain the capacity.
9.6 If Overthrust and an existing shipper enter into a
contract to continue service that was not subject to an
evergreen clause or the right of first refusal, the bidding
requirements of 7 will apply. However, any Shipper that
acquires available capacity according to this section will
not be required to repeat the bidding procedures outlined in
7 of this tariff.
10. CREDITWORTHINESS
10.1 Acceptance of a request for transportation
service and performance of that service is contingent upon a
satisfactory credit appraisal by Overthrust of Shipper's
creditworthiness. All required credit information shall be
evaluated by Overthrust on a uniform basis for all similarly