Mississippi River Transmission Corp.

Original Volume No. 1-A

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 02/01/1990, Docket: GT90- 12-000, Status: Effective

First Revised Sheet No. 39 First Revised Sheet No. 39 : Effective

Superseding: Original Sheet No. 39

 

 

TRANSPORTATION

GENERAL TERMS AND CONDITIONS

(Continued)

 

3. FACILITIES (Continued)

 

receive, monitor, measure, transport or deliver gas to or for the

account of Shipper, including without limitation, overhead charges

incurred as a result of the installation of any such facilities and any

federal income tax associated with any amounts which qualify as

contributions in aid of construction under the Tax Reform Act of 1986

or any successor legislation. Shipper shall repay Transporter, as

invoiced by Transporter or in kind, at Transporter's option, for any

gas lost from Transporter's pipeline as a result of the installation,

modification, or expansion of such facilities. If Transporter elects

to invoice Shipper for such gas lost, the charges will be equal to the

volume of gas lost multiplied by Transporter's actual average cost of

gas ("WACOG") for the most recent prior month for which such data are

available.

 

3.2 If the measurement and appurtenant facilities are existing

at the Receipt and/or Delivery Point(s), and such facilities are deemed

adequate and operable in Transporter's sole determination, then such

facilities shall be used; however, if any modification or expansion of

any such existing facility is deemed necessary, in Transporter's sole

determination, then such modification or expansion shall be performed

by Transporter with Shipper's consent at Shipper's sole expense and

Shipper agrees to reimburse Transporter for all costs, including

without limitation overhead charges, incurred in such modification or

expansion.

 

3.3 Each party shall at all reasonable times have access for

inspection to the premises of the party operating the facilities at the

Receipt and/or Delivery Point(s) insofar as such premises are connected

with any matter or thing covered hereby; but the operation,

installation, removal, repair and testing of the measuring equipment

and changing of charts shall be done only by the party operating said

equipment at the Receipt Point and/or Delivery Point. Either party