Texas Eastern Transmission Corporation
Sixth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/01/2000, Docket: RP01- 69-000, Status: Effective
Second Revised Sheet No. 619 Second Revised Sheet No. 619 : Effective
Superseding: First Revised Sheet No. 619
GENERAL TERMS AND CONDITIONS
(Continued)
August 1 each year shall only include revised Current EPC changes. The EPC
Surcharges filed to be effective February 1 each year shall be effective for the
full twelve (12) month period beginning February 1 of each year.
15.2 Transition Cost Recovery Mechanism
(A) This Section 15.2 establishes the procedures under which Pipeline will recover the
costs incurred as a result of implementing, in connection with implementing, or
attributable to, the requirements of Order No. 636 (such costs hereinafter referred
to "Transition Costs"). This Section 15.2 shall be applicable until such time as
Pipeline has recovered the total aggregate Transition Costs.
(B) [RESERVED FOR FUTURE USE]