GENERAL TERMS AND CONDITIONS

(Continued)

 

applicable zone and rate schedule by the estimated demand and

commodity units to be billed weighted on the basis of the

Base Electric Power Cost Units for each applicable zone and

rate schedule under all EPC Rate Schedules for the twelve

month period beginning February 1. The EPC Surcharges for

each applicable zone and rate schedule shall be rounded to

the nearest 1/100 of a cent for commodity surcharges and

1/1000 of a dollar for demand surcharges.

 

(5) Base Electric Power Cost Unit

 

The Base Electric Power Cost Unit for each applicable zone

and rate schedule which are the unit Electric Power Costs

included in the Base Tariff Rates under Pipeline's EPC Rate

Schedules shall be reflected on Sheet Nos. 130 through 133 of

this FERC Gas Tariff.

 

(6) EPC Adjustment

 

The Current Unit EPC Change for each applicable zone and rate

schedule computed in accordance with Section 15.1(B)(2) and

the EPC Surcharge computed in accordance with Section

15.1(B)(4) above shall be added to the applicable demand and

commodity components of Pipeline's EPC Rate Schedules and the

last previous units computed under the same sections, which

are contained in such rates, if any, shall be removed. Rate

adjustments hereunder shall be applied to Pipeline's rates in

such a manner that historical rate design concepts shall be

maintained. In the event a change in rates under the

provisions of this Section 15.1 is prevented by law from

going into effect on a date specified herein, it shall be

made effective as soon thereafter as permitted by law.

 

(C) Procedure for Filing:

 

Pipeline shall file and place into effect, subject to suspension

for not more than one day, changes in its jurisdictional rates to

reflect any increase or decrease in the cost to Pipeline for the

use of electric power. Filings hereunder shall be made effective

on February 1 and August 1. Not less than thirty (30) days prior

to the proposed effective date of a rate change pursuant to this

Section 15.1, Pipeline shall file with the Commission and shall

mail to each of its jurisdictional Customers, and interested state

commissions revised tariff sheets reflecting the proposed rate

change together with a statement showing the computation of the

rate change. The filing effective February 1 each year shall

include revised EPC Surcharges computed pursuant to Section

15.1(B)(4) above and revised Current Unit EPC Changes computed in