Texas Eastern Transmission Corporation
Sixth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/1993, Docket: RS92- 11-009, Status: Effective
Original Sheet No. 524 Original Sheet No. 524 : Effective
GENERAL TERMS AND CONDITIONS
(Continued)
7.10 Flow Control
The Pipeline shall control flow of gas into and out of its facilities at all
measurement facilities, but may allow the following if all of Pipeline's
operating standards and requirements are met: (a) Pipeline may allow third
parties to control flow into the Pipeline's facilities, and (b) Pipeline may
allow third parties to control flow out of the Pipeline's facilities, but
reserves the right to override the third party's flow control equipment.
7.11 Maintenance
(A) Major Maintenance
Major Maintenance shall include, but not be limited to, the repair
or replacement of major components and equipment required to
support the Measurement Operations. For measurement facilities
which Customer or third party owns and for which Pipeline performs
Measurement Operations, such Customer or third party shall be
responsible for any and all associated costs of such Major
Maintenance unless otherwise agreed by Pipeline and Customer or
third party.
(B) Routine Maintenance
Routine Maintenance shall be the normal day to day maintenance
required to support the Measurement Operations or necessary to
upkeep the measurement facility and shall include, but not be
limited to, replacement of minor replacement parts for
instrumentation, measurement equipment (including the RTU) and
minor valves and piping. The entity (Pipeline, Customer or third
party) which performs the Measurement Operations for the
measurement facility shall also be responsible for such Routine
Maintenance and any and all associated costs of such Routine
Maintenance unless otherwise agreed by Pipeline and Customer or
third party.