Texas Eastern Transmission Corporation
Sixth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 10/20/1993, Docket: RP94- 18-000, Status: Effective
Original Sheet No. 502A Original Sheet No. 502A : Effective
GENERAL TERMS AND CONDITIONS
(Continued)
physical injection capability based on such Customer's MDIQ.
An operational flow order issued pursuant to this Section
4.3(J) shall not affect those Customers whose Storage
Inventory is greater than or equal to 95% of MSQ at the time
of issuance of the operational flow order or those Customers
whose remaining open inventory divided by the MDIQ is equal
to or less than the number of days from the day following
issuance of the operational flow order through the following
November 15 minus 15 days. For the duration of the
operational flow order under this Section 4.3(J), if the
scheduled injection quantity is less than the Mandatory
Injection Quantity required for any Customer on any day, the
operational flow order penalty pursuant to Section 4.3(A)(2)
of the General Terms and Conditions will be imposed for all
quantities less than 100% of the Mandatory Injection
Quantity. An operational flow order issued pursuant to this
Section 4.3(J) shall be canceled by Pipeline or when the
aggregate Storage Inventory is equal to 95% of MSQ. An
operational flow order issued pursuant to this Section
4.3(J) shall be canceled by Pipeline, on a Customer-by-
Customer basis, when each Customer's Storage Inventory is
equal to 95% of MSQ.
(K) In the event total storage withdrawal capabilities decline
to less than total daily contracted storage withdrawal
rights as revised due to in-field transfers of inventory,
Pipeline may issue an operational flow order pursuant to
this Section 4.3(K) of the General Terms and Conditions
requiring that all quantities of storage inventory
transferred in place during the current winter period,
November 15 to April 15, be made available to the storage
Customer having received the transfer at the lesser of the
storage withdrawal rights of the service receiving the
transfer or providing the transfer. Withdrawal rates,
including ratchets, for the Customer's non-transferred
inventory will be calculated in accordance with the storage
withdrawal rights of that service. After the Customer has
withdrawn his non-transferred inventory, the transferred
inventory will be made available at the withdrawal rates,
including ratchets, as calculated above. This operational
flow order will be canceled at such time that sufficient
quantities of gas have been injected in the aggregate by all
storage Customers to increase physical withdrawal capability
to the sum of all Customers' contractual rights.