Texas Eastern Transmission Corporation
Sixth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/1993, Docket: RS92- 11-009, Status: Effective
Original Sheet No. 500 Original Sheet No. 500 : Effective
GENERAL TERMS AND CONDITIONS
(Continued)
pursuant to this Section 4.3(E) is canceled. Receipts under Rate
Schedules CDS, SCT, and TABS-1 must be decreased within
twenty-four (24) hours to balance with decreases in scheduled
delivery quantities. For the duration of this operational flow
order, if actual receipt quantities for a day exceed 105% of
scheduled delivery quantities for that day for any of Pipeline's
rate schedules, operational flow order penalties will be imposed
for all receipt quantities in excess of 100% of the scheduled
delivery quantities pursuant to Section 4.3(A)(2) of the General
Terms and Conditions. An operational flow order issued under this
Section 4.3(E) shall not affect a Customer's right to increase
delivery quantities or reduce receipt quantities pursuant to Rate
Schedules CDS, FT-1, SCT and TABS-1. Scheduled delivery
quantities in excess of scheduled receipts will be handled in
accordance with Section 8.1(E) of the General Terms and
Conditions. An operational flow order issued pursuant to this
Section 4.3(E) shall be canceled by Pipeline when storage
injections are within 1 MMDth of Customer's nominated storage
inventory.
(F) In the event receipts in segments of the Access Area exceed
scheduled receipts and the capacity of the segment, so that high
system pressures back off scheduled receipt quantities, Pipeline
may issue an operational flow order pursuant to this Section
4.3(F) of the General Terms and Conditions to all Point(s) of
Receipt and under all of Pipeline's rate schedules in the affected
segment of the Access Area stating that a high pressure condition
exists. For the duration of this operational flow order, if
actual receipt quantities for a day exceed 105% of scheduled
receipt quantities for that day for an affected segment of the
Access Area, operational flow order penalties for all receipt
quantities in excess of 100% of the scheduled receipt quantities
will be imposed on the Point of Receipt or under each of
Pipeline's rate schedules as appropriate pursuant to Section
4.3(A)(2) of the General Terms and Conditions. For all Rate
Schedule TABS-1 Service Points and individual Point(s) of Receipt
in the affected segment, imbalances incurred during the term of
this operational flow order attributable to receipts in excess of
scheduled receipt quantities must be scheduled as a receipt
reduction on the day following posting of such operational
imbalance on the LINKþ System. For current month imbalances
incurred prior to the order issued under this Section 4.3(F) due
to receipts in excess of scheduled receipt quantities, receipt
reductions equal to 10% of the imbalance will be scheduled daily
until the imbalance is corrected or until the operational flow
order is canceled. An operational flow order issued pursuant to
this Section 4.3(F) will be canceled by Pipeline when the high
pressure condition described above has been corrected and the
imbalances created by the high pressure condition have been
reasonably resolved.