Texas Eastern Transmission Corporation
Sixth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 01/11/1999, Docket: RP99- 52-003, Status: Effective
Fifth Revised Sheet No. 487A Fifth Revised Sheet No. 487A : Effective
Superseding: Fourth Revised Sheet No. 487A
(4) Notwithstanding Sections 4.1(A)(1) and 4.1(A)(2),
Customer shall have the right to submit an intra-day
nomination to revise the Point(s) of Receipt and/or
Point(s) of Delivery to any non-constrained pipeline
segment for a timely transportation nomination that had
the original Point of Receipt or Point of Delivery
quantity denied due to over-nomination of that point
or non-confirmation of the quantity at that point.
Such intra-day nomination may be implemented by
Pipeline subject to confirmation and if such intra-day
nomination is permitted, in Pipeline's reasonable
judgment, by Pipeline's system operating conditions.
(5) When a nomination for a date range is received, each
day within that range is considered an original
nomination. When a subsequent nomination is received
for one or more days within that range, the previous
nomination is superseded by the subsequent nomination
only to the extent of the days specified. The days of
the previous nomination outside the range of the
subsequent nomination are unaffected. Nominations have
a prospective effect only.