Texas Eastern Transmission Corporation
Sixth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 01/07/2001, Docket: RP01-182-002, Status: Effective
Sub First Revised Sheet No. 456B Sub First Revised Sheet No. 456B : Effective
Superseding: First Revised Sheet No. 456B
GENERAL TERMS AND CONDITIONS
(Continued)
allocated to the request in the firm service queue, on the date such
capacity becomes available and is posted on LINK®, that provides the
highest net present value to Pipeline unless an open season is conducted
pursuant to this Section 3.12(A). If an open season is conducted,
Customer(s) or potential customer(s) in the firm service queue shall be
notified and given an opportunity to participate in such open season. If
such Customer or potential customer elects not to participate in any such
open season, its request shall be deemed null and void.
(7) In addition to the procedures set forth in this Section 3.12(A), Pipeline
shall have the right, but shall not be obligated, from time to time to hold
open seasons for potential expansion projects or for available capacity for
which no request has been received. During any such open season, Pipeline
shall allocate the capacity subject to such open season on the basis of the
highest net present value to Pipeline, as determined pursuant to the method
described in Section 3.12(A)(1). In this connection, to the extent
Pipeline has available unsubscribed capacity, Pipeline reserves the right,
but shall not be obligated, to reserve such capacity for a future expansion
open season provided that any such open season is conducted by the later of
one (1) year from the date Pipeline posts such capacity as being reserved
or the date such reserved capacity actually becomes available for use.
(B) Pipeline will post available capacity before it provides such information to any
potential customer.
(C) Pipeline reserves the right to reject any request for service at less than
maximum rate, which may detrimentally impact the operational integrity of
Pipeline's system, which does not satisfy all the terms of a specific posting
and/or which contains terms and conditions other than those contained in
Pipelineþs FERC Gas Tariff. If Pipeline rejects an otherwise successful request
for available capacity posted pursuant to Section 3.12(B), Pipeline will post on
LINK® its reason(s) for such rejection.
(D) All requests received during an open season remain binding on the requesting
party through the end of the open season, unless withdrawn by the requesting
party prior to the close of the open season; provided, however, a requesting
party may withdraw its previous request and submit a request with a higher net
present value during the open season, but neither the requesting party nor an
affiliate thereof may submit a request with a lower net present value during the
open season. At the end of the open season, all requests either withdrawn or
not accepted shall be deemed null and void. In addition, at the end of the open
season, the winning bid is binding on the party that submitted the winning bid
and a contract will be deemed to be executed at that time and Customer agrees to
comply with the requirements of Section 3.6 of these General Terms and
Conditions in this regard.