RATE SCHEDULE FTS-8

(Continued)

 

3.5 Pipeline shall not be obligated to adjust the Reservation Charge

pursuant to Section 3.4 when Pipeline's failure to deliver on any one day

at least 95% of the quantity of gas requested by Customer to be delivered

at Point(s) of Delivery which gas Pipeline is obligated to deliver on a

firm basis at such Point(s) of Delivery on such day up to the MDQ:

 

(A) is the result of the conduct of Customer or the downstream

operator of the facilities at the Point of Delivery;

 

(B) is the result of Pipeline having operational flow orders in

effect on such day;

 

(C) is the result, during the period from May 1 through November

1 of any year, of Pipeline performing routine operational

maintenance and repair;

 

(D) is the result of Pipeline performing at anytime repair and

maintenance of its facilities to comply with applicable

regulatory requirements, or