Texas Eastern Transmission Corporation

Sixth Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 06/01/1993, Docket: RS92- 11-009, Status: Effective

Original Sheet No. 311 Original Sheet No. 311 : Effective

 

RATE SCHEDULE ISS-1

(Continued)

 

5.5 Limitation Upon Total Injection Pipeline shall be obligated to accept

gas for storage for Customer's account in accordance with the above procedure

only when Customer's Storage Inventory is less than Customer's Maximum Storage

Quantity and only to the extent Pipeline determines that such injection shall not

be detrimental to Pipeline's ability to satisfy its firm obligations under its

firm rate schedules.

 

6. WITHDRAWAL PROVISIONS

 

6.1 General Procedure If Customer desires the delivery of gas stored for

Customer's account under this Rate Schedule, it shall give notice to Pipeline

specifying the quantity of gas, not in excess of the MDWQ, plus Applicable

Shrinkage, which Customer desires to be withdrawn from storage under this Rate

Schedule during such day. Subject to Section 7 of this Rate Schedule ISS-1,

Pipeline shall thereupon deliver to Customer the quantity of gas subject to the

limitations set forth herein. In addition to the withdrawal of gas from storage

for delivery through a transportation service on Pipeline's system, gas may be

withdrawn for delivery into the facilities of third parties at the points of

interconnection between Pipeline and the facilities of such third parties at

Oakford and Leidy Storage Fields provided that such withdrawals do not result in

Customer withdrawing gas in excess of his MDWQ or MSQ. A separate transportation

charge will not be applicable to these deliveries.

 

6.2 Notice Required The notice given by Customer to Pipeline for

withdrawals on any day shall be in accordance with Section 4 of Pipeline's

General Terms and Conditions of this FERC Gas Tariff.

 

6.3 Limitation Upon Total Withdrawals Pipeline shall be obligated to

deliver to Customer gas for Customer's account only when Customer's Storage

Inventory is greater than zero and only to the extent Pipeline determines that

such withdrawal shall not be detrimental to Pipeline's ability to satisfy its

firm obligations under its firm rate schedules.

 

7. PROCEDURES FOR SCHEDULING, ALLOCATION AND INTERRUPTION OF

STORAGE SERVICE

 

7.1 If Customer desires to inject or withdraw natural gas pursuant to this

Rate Schedule ISS-1, Customer shall give notice to Pipeline in accordance with

Section 4 of Pipeline's General Terms and Conditions specifying the quantity of

gas Customer desires to inject or withdraw and specifying the Rate Schedule ISS-1

Transportation Rate Schedules service agreement(s) to be utilized to accomplish

the delivery of such gas for injection or the receipt of such gas for withdrawal.

In no event shall the quantity to be injected or withdrawn, as applicable, exceed

the quantity of gas scheduled for transportation pursuant to Section 4 of

Pipeline's General Terms and Conditions under the specified Rate Schedule ISS-1

Transportation Rate Schedules service agreement(s) to accomplish the delivery of

such gas for injection or the receipt of such gas for withdrawal.