Texas Eastern Transmission Corporation
Sixth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/1993, Docket: RS92- 11-009, Status: Effective
Original Sheet No. 299 Original Sheet No. 299 : Effective
RATE SCHEDULE FSS-1
(Continued)
5.2 Pipeline shall permit transfers of title of gas in Storage Inventory,
provided both Customers have executed a service agreement under Rate Schedules
SS-1, FSS-1 and/or ISS-1 and that such transfer does not permit either Customer
to exceed its MSQ specified in such service agreement. Such transferred
quantities shall not be included in any Customer's Storage Inventory for purposes
of determining Customer's daily withdrawal rights pursuant to Section 6 until
twenty-four (24) hours following the date of transfer or as provided in Section
6.3 of this Rate Schedule.
5.3 In addition to accepting gas for storage injection at the FSS-1 Storage
Point, Pipeline will accept gas tendered at points of interconnection between
Pipeline and third party facilities at Oakford and Leidy Storage Fields provided
that such receipt does not result in Customer tendering aggregate quantities for
storage in excess of the Customer MDIQ .
5.4 Notice Required The notice given by Customer to Pipeline for
injections on any day shall be in accordance with Section 4 of Pipeline's General
Terms and Conditions of this FERC Gas Tariff.
5.5 Injection Quantities The maximum injection quantity of gas which
Pipeline is obligated on any day to inject into storage under this Rate Schedule
shall be the MDIQ.
5.6 Limitation Upon Total Injections Pipeline shall be obligated to
accept gas for storage for Customer's account in accordance with the above
procedure only when Customer's Storage Inventory is less than Customer's MSQ.
6. WITHDRAWAL PROVISIONS
6.1 General Procedure If Customer desires the delivery of gas stored for
Customer's account under this Rate Schedule, it shall give notice to Pipeline
specifying the quantity of gas, not in excess of the quantity determined pursuant
to Section 6.3, plus Applicable Shrinkage, which Customer desires to be withdrawn
from storage under this Rate Schedule during such day. Pipeline shall thereupon
deliver to Customer the quantity of gas subject to the limitations set forth
herein.
In addition to the withdrawal of gas from storage for delivery through a
transportation service on Pipeline's system, gas may be withdrawn for delivery
into the facilities of third parties at the points of interconnection between
Pipeline and the facilities of such third parties at Oakford and Leidy Storage
Fields provided that such withdrawals do not result in Customer withdrawing gas
in excess of his MDWQ or MSQ. A separate transportation charge will not be
applicable for these deliveries.
6.2 Notice Required The notice given by Customer to Pipeline for
withdrawals on any day shall be in accordance with Section 4 of Pipeline's
General Terms and Conditions of this FERC Gas Tariff.