NOTICE OF RATE CHANGE ADJUSTMENTS

 

 

Base Electric

FSS-1 Tariff Power Cost ASA Adjusted

CHARGES Rate* Adjustment Surcharge Rate

$/dth $/dth $/dth $/dth

 

Pursuant to Sections 3.2 and 3.3 of Rate Schedule FSS:-1

MAXIMUM

RESERVATION CHARGE 0.9200 0.9200

SPACE CHARGE 0.1343 0.1343

INJECTION CHARGE 0.0338 0.0007 0.0345

WITHDRAWAL CHARGE 0.0338 0.0007 0.0345

EXCESS INJ. CHG. 0.1938 0.0007 0.1945

EXCESS WITH. CHG. 0.1938 0.0007 0.1945

RES. CHARGE ADJ. 0.0303 0.0303

 

MINIMUM

RESERVATION CHARGE 0.0000 0.0000

SPACE CHARGE 0.0000 0.0000

INJECTION CHARGE 0.0338 0.0007 0.0345

WITHDRAWAL CHARGE 0.0338 0.0007 0.0345

EXCESS INJ. CHG. 0.0338 0.0007 0.0345

EXCESS WITH. CHG. 0.0338 0.0007 0.0345

RES. CHARGE ADJ. 0.0000 0.0000

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 