Texas Eastern Transmission Corporation
Sixth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/01/2000, Docket: RP88- 67-074, Status: Effective
Eighth Revised Sheet No. 63 Eighth Revised Sheet No. 63 : Effective
Superseding: Seventh Revised Sheet No. 63
NOTICE OF RATE CHANGE ADJUSTMENTS
Base Electric
Tariff Power Cost ASA Adjusted
Rate* Adjustment Surcharge Rate
$/dth $/dth $/dth $/dth
Pursuant to Sections 3.2, 3.3, and 3.5 of Rate Schedule SCT:
SCT DEMAND CHARGES**
ACCESS AREA
MAXIMUM - -0.0040 -0.0040
MINIMUM - 0.0000 0.0000
MARKET AREA
MAXIMUM - M1-M1 -0.0060 -0.0060
M1-M2 -0.0090 -0.0090
M1-M3 -0.0100 -0.0100
MINIMUM - M1-M1 0.0000 0.0000
M1-M2 0.0000 0.0000
M1-M3 0.0000 0.0000
*The base tariff rate is the effective rate on file with the
Commission, excluding adjustments approved by the Commission.
**Pursuant to Section 26 of the General Terms and Conditions.