Mid Louisiana Gas Company
First Revised Volume No. 2
Contents / Previous / Next / Main Tariff Index
Effective Date: 01/11/1977, Docket: GT90- 37-000, Status: Effective
Original Sheet No. 75 Original Sheet No. 75 : Effective
RATE SCHEDULE X-8
(Continued)
ARTICLE IV
TRANSPORTATION FOR SOUTHERN
Mid Louisiana will accept for Southern's account at the delivery point
specified in the gas purchase contract between Mobil and Mid Louisiana
dated April 11, 1975), that part of the gas produced in Block 140, which
Southern purchases from Mobil, its successors, or assigns, pursuant to the
assignment by Mid Louisiana to Southern dated April 18, 1975. Mid Louisiana
will redeliver such volumes to Southern at the Grand Bay Exchange Point at
no cost to Southern.
ARTICLE V
FACILITIES
1. Mid Louisiana shall install, pay for, maintain and operate, or
cause to be installed, maintained and operated: (i) a connecting pipeline,
of not less than six inches in diameter, for the transmission of its and
Southern's gas from the point where Mobil makes the Block 140 gas available
in Plaquemines Parish, Louisiana to the Grand Bay Exchange Point; and (ii)
a meter and appurtenant facilities at the point in Plaquemines Parish where
Mobil makes the Block 140 gas available. Mid Louisiana shall be responsible
for measurement at this point.
2. Southern shall install, pay for, maintain and operate a tap on its
line at the Grand Bay Exchange Point.
3. Mid Louisiana shall install, pay for, maintain and operate: (i) a
connection between the outlet of Ashland's Cargas Compressor Station and
its existing lines adjacent thereto; (ii) taps on its lines; and (iii) a
meter and appurtenant facilities at the outlet of the station. Mid
Louisiana shall be responsible for measurement at the Cargas Exchange
Point.
4. Southern and Mid Louisiana shall install and Mid Louisiana shall
operate the facilities necessary for the