Mid Louisiana Gas Company

Third Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 03/15/1999, Docket: RP99-225-000, Status: Effective

Fourth Revised Sheet No. 86 Fourth Revised Sheet No. 86 : Effective

Superseding: Third Revised Sheet No. 86

 

2.5 OPTION TO WAIVE. Pipeline shall have the option to waive, on

a non-discriminatory basis, any of the above quality

specifications to permit Customer to tender gas to Pipeline if

Pipeline, in its reasonable judgment, determines that such gas

shall not adversely affect Pipeline's facilities or

operations.

 

3. ELECTRONIC BULLETIN BOARD & Electronic Communication

 

3.1 Pipeline has established an electronic bulletin board (EBB)

system for use by any EBB system subscriber. The EBB system

shall be available on a nondiscriminatory basis to any EBB

system subscriber that has compatible equipment for electronic

transmission of data, provided that such subscriber has been

assigned a user identification and password and agrees to

comply with the procedures for access to and use of the EBB

system. Information and instructions on accessing the EBB

system may be obtained by calling Pipeline at (713) 650-8900

or by dialing in to the EBB system at (713) 752-0651.

 

3.2 The EBB system provides on-line help, a search function that

permits an EBB system subscriber to locate information

concerning a specific transaction, and menus that permit an

EBB system subscriber to access separately each record in the

transportation request log, notices of available

capacity, critical notices and standards of conduct information.

The EBB system, to the extent necessary, permits an EBB system

subscriber to electronically download a file(s) from the EBB

system and to separate extremely large documents into smaller

files prior to such downloading. Pipeline will maintain and

retain daily back-up records of the information displayed on

the EBB system for the prior three (3) years (except that

information prior to September 1, 1993 which is available in

more limited content and format) and permit an EBB system

subscriber to review and download those records, upon request,

which shall be archived and reasonably accessible. Pipeline shall

periodically delete transactions from the EBB system files when

transactions have been completed. Information on the most recent

entries shall appear ahead of older information.