Enbridge Pipelines (Midla) Inc.
Fourth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 10/01/2001, Docket: GT01- 30-000, Status: Effective
Original Sheet No. 183 Original Sheet No. 183 : Effective
Pipeline instead of using the estimated quantity provided in
Paragraph 24.3; provided, however, that Customer's meters are
accurately indicating, within the tolerances provided in
Paragraph 24.3, until such time as the meters of Pipeline shall be
adjusted, repaired or replaced. If Customer's meters are used for
the purpose of determining the quantity of gas delivered by
Pipeline to Customer, Customer's meters shall be tested at such
time and upon the call of Pipeline as herein provided in the case
of Pipeline's meters.
24.5 All meter charts or other records of registration when removed
from Pipeline' meters shall be forwarded to the offices of
Pipeline for computation and checking; thereafter, Pipeline shall
forward such charts and/or records to Customer, as Customer may
direct, for Customer's inspection. After making such inspection
as desired, Customer shall within ten (10 days return such charts
and/or records to Pipeline for retention for a minimum period of
two (2) years for the future reference of both parties. Should
measurement data correction(s)be required by any party, such
correction(s) shall be processed within six (6) months of the
production month in which the error occured. Any such correction(s
shall be subject to approval by all parties for ninety (90) days
following such correction(s).
24.6 Customers shall furnish to Pipeline on or before the fifth (5th)
business day of the month following the end of the month being
allocated or billed any and all measurement data required by
Pipeline for purposes of allocation or billing.