Enbridge Pipelines (Midla) Inc.

Fourth Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 10/01/2001, Docket: GT01- 30-000, Status: Effective

Original Sheet No. 135 Original Sheet No. 135 : Effective

 

6.4 (a) Should a Customer desire waiver of the capacity curtailment

provisions of Paragraph 6.3(a) during emergency situations

in order to prevent injury to life or property or to provide

minimum plant protection, Pipeline shall retain the right

but not the obligation or duty to provide for an exception

in all or part to its curtailment provisions set forth

herein.

 

(b) The Customer seeking waiver shall inform Pipeline and

Pipeline shall inform all affected Customers as to the

extent of the situation or emergency giving rise to the

necessity for an exception to the curtailment provisions of

this Section 6 and the measures that have been taken to

reduce the extent of the situation or emergency.

 

(c) A Customer whose gas was diverted under this Paragraph 6.4

shall have the option to be compensated for such gas by the

Customer whose request for emergency relief resulted in a

loss of transportation capacity or the need for Pipeline to

divert gas either through the delivery of quantities of gas

equal to the quantities of