Enbridge Pipelines (Midla) Inc.
Fourth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 10/01/2001, Docket: GT01- 30-000, Status: Effective
Original Sheet No. 116 Original Sheet No. 116 : Effective
4.4 Releases of less than five (5) Months
(a) A firm Customer that wishes to release capacity for a term
of less than five months ( and thereby become a Releasing
Customer) and that has identified no Prearranged Customer
must notify Pipeline electronically or in writing no later
than 1:00 P.M. on the day prior to nominating such released
capacity (hereinafter called Customer's Notice). All terms
and conditions included in Customer's Notice must be
objectively stated and applicable to all Potential Customers
on a non-discriminatory basis. Customer's Notice shall
include the information set forth in Paragraph 4.5.
(b) In order to qualify for processing in accordance with the
with the capacity release timeline herein stipulated and
before Customer's Notice is posted on Pipeline's EBB system,
Pipeline shall review such Customer's Notice to ensure that
Customer's Notice complies with the requirements of
Paragraph 4.5. Compliant notices shall be posted upon
receipt by Pipeline unless otherwise stipulated by Releasing
Customer. In the event that Customer's Notice does not meet
the requirements of Paragraph 4.5, Pipeline will promptly
notify Customer and allow Customer to revise its Customer's
Notice to comply with these requirements. Pipeline shall
not be required to adhere to the capacity release timeline
in order to process nor shall Pipeline be required to post a
Customer's Notice which does not comply with the
requirements set forth in Paragraph 4.5. A Customer's
Notice posted by Pipeline shall include the date and time
such Customer's Notice was posted on Pipeline's EBB. A
Customer's Notice shall be posted on Pipeline's EBB system
until the expiration of the minimum Bid Period set forth in
Paragraph 4.4(d) or, if longer, the Bid Period specified in
the Customer's Notice. A Releasing Customer may withdraw
its Customer's Notice by providing written or electronic
notice to Pipeline of such withdrawal prior to the close of
the Bid Period; provided, however, such withdrawal shall
only be valid if such Releasing Customer has an
unanticipated requirement for capacity and no minimum bid
has been tendered for such capacity. Pipeline shall be held
harmless by the Releasing Customer for the withdrawal of
capacity. The notice must contain the reason for the
withdrawal, which Pipeline shall post on its EBB. A
Releasing Customer shall be permitted to search for a party
to contract for its capacity both before and after such
capacity is