Enbridge Pipelines (Midla) Inc.
Fourth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/2002, Docket: RP00-400-001, Status: Pending
First Revised Sheet No. 113 First Revised Sheet No. 113 : Pending
Superseding: Original Sheet No. 113
Pipeline's EBB system until the expiration of the minimum
Bid Period set forth in this Paragraph 4.3 or, if longer,
the expiration of the Bid Period specified in the Customer's
Notice. A Releasing Customer may withdraw its Customer's
Notice by providing written or electronic notice to Pipeline
of such withdrawal prior to the close of the Bid Period;
provided, however, such withdrawal shall only be valid if
such Releasing Customer has an unanticipated requirement for
capacity and no minimum bid has been tendered. Pipeline
shall be held harmless by the Releasing Customer for the
withdrawal of capacity. The notice must contain the reason
for the withdrawal, which Pipeline shall post on its EBB. A
Releasing Customer shall be permitted to search for a party
to contract for its capacity both before and after such
capacity is posted on Pipeline's EBB system; provided,
however, that a Service Agreement shall not be executed
until the capacity has been posted for release on Pipeline's
EBB system and the procedures set forth in this Section 4
have been completed.
(e) Before a bid of a Potential Customer for released capacity
is posted on Pipeline's EBB system, Pipeline shall review
such bid to ensure that the bid complies with the
requirements of this Section 4. Compliant bids shall be
posted upon receipt by Pipeline unless otherwise stipulated
by Releasing Customer. A bid posted by Pipeline shall
include all terms and conditions of such bid except for the
identity of the Potential Customer. In the event that the
bid does not meet the requirements of this Section 4,
Pipeline will notify the Potential Customer of such bid
deficiency and allow the Potential Customer to revise its
bid to comply with these requirements. Pipeline shall not
be required to adhere to the capacity release time line in
order to process nor shall Pipeline be required to post a
bid which does not comply with the requirements set forth in
this Section 4, and shall not be required to post a bid
which is not resubmitted, in the event revision is required,
prior to the expiration of the Bid Period. Before the
expiration of the Bid Period, a Potential Customer shall be
permitted to withdraw its bid by notifying Pipeline through