K N Wattenberg Transmission LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/1997, Docket: RP97-144-001, Status: Effective
Original Sheet No. 51A Original Sheet No. 51A : Effective
f. Transporter shall estimate missing or late measurement
data. The measuring party shall provide the estimate.
When actual data is acquired, it shall be treated as a
prior period adjustment. Measurement data corrections
should be processed within six months of the production
month with a three month rebuttal period. This standard
shall not apply in the case of deliberate omission or
misrepresentation or mutual mistake of fact. Parties
other statutory or contractual rights shall not
otherwise be diminished by this provision. Measurement
prior period adjustments shall be taken back to the
production month. A meter adjustment becomes a prior
period adjustment after the fifth business day
following the business month. Measurement data
corrections should be processed within six months of
the production month with a three month rebuttal
period.
g. Prior period adjustments time limits should be made
within six months from the date of the initial
transportation invoice and seven months from the date
of the initial sales invoice with a three month
rebuttal period, excluding government required rate
changes. These standards shall not apply in the case of
deliberate omission or misrepresentation or mutual
mistake of fact. Parties other statutory or contractual
rights shall not otherwise be diminished by this
provision.