K N Wattenberg Transmission LLC
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/1999, Docket: RP99-407-000, Status: Effective
First Revised Sheet No. 69 First Revised Sheet No. 69 : Effective
Superseding: Original Sheet No. 69
GENERAL TERMS AND CONDITIONS FOR SERVICES - continued
25. DETERMINATION OF DELIVERIES
25.1 For purposes of billing, the order of nominated services through a
particular delivery point, unless otherwise determined, will be:
a. Nominated FT;
b. Nominated IT;
c. Authorized contract overrun deliveries;
d. Imbalance gas;
e. Unauthorized contract overrun deliveries.
25.2 At any receipt or delivery point, Transporter will allocate
flows to Shippers according to the following methodology:
a. Gas will be allocated first to firm transportation through
the point, up to the daily nomination. If insufficient
gas is available to satisfy firm nominations, the
available gas will be allocated pro rata based on firm
nominations;
b. Any remaining volumes will be allocated pro rata to
interruptible transportation based on the approved
nominations.
25.3 PREDETERMINED ALLOCATION AGREEMENTS. Transporter will enter into
mutually acceptable predetermined allocation agreements with
upstream or downstream parties to accommodate allocation
methodologies different than outlined in Section 25.2. The
allocation methodology types which two parties may agree upon are
ranked, pro rata, percentage, swing and operator provided
value. If the two parties cannot agree upon an allocation
methodology, pro rata based on confirmed nominations
shall be used as the default method. The party
responsible for custody transfer (the party performing the
measurement function) shall provide the allocation. Two welded
parties shall agree on who submits a predetermined allocation
methodology and who allocates at the point before gas flows.
There is no need to submit predetermined allocation if a
transportation service provider has an operational balancing
agreement in effect for a point. Only one predetermined
allocation methodology shall be applied per allocation period.
The upstream or downstream party providing the point confirmation
shall submit the predetermined allocation to the allocating party
after or during confirmation and before start of gas day. The
allocating party shall send