RATE SCHEDULE LTD-1
FIRM LNG TANKER DISCHARGING SERVICE
(Continued)
5. OPERATING CONDITIONS (Continued)
5.3 Port Facilities and LNG Discharging
(a) Operator shall, subject to Section 5.2(a) above, provide port facilities
capable of receiving LNG tankers as follows:
Overall Length: Between 180.0 meters and 300.00 meters
Width: Between 24.0 meters and 48.5 meters
Laden Draft: No greater than 11.3 meters
Capacity: 70,000 - 140,000 cubic meters of LNG
(b) Operator shall make available or cause to be made available to Buyer at the
Cove Point terminal, berthing and discharging facilities including:
(i) mooring equipment;
(ii) lighting sufficient to permit customary docking and undocking maneuvers
by day or by night to the extent permitted by the port authorities;
(iii)unloading arms, pipes and appurtenant facilities permitting the
discharging of LNG at an average rate of 10,200 cubic meters per hour and
a maximum rate of 12,000 cubic meters per hour, at a discharge pressure
of 6 bar gauge at the Discharge Point;
(iv) a vapor return line from the shore facilities to the LNG tanker adequate
to maintain appropriate operating pressure in the tanks of the LNG
tanker; and
(v) gangways on the pier to provide access for personnel to and from the LNG
tanker.
(c) The captain of the Buyer's LNG tanker shall give written notice to Operator at
the time the LNG tanker is ready to commence discharging LNG. Operator shall
take all appropriate measures within its reasonable control to permit the
unloading of the LNG tanker as quickly as possible. Unless otherwise permitted
by Operator, Buyer's LNG tanker shall depart from the Cove Point pier as soon
as discharging operations have finished and the LNG tanker is ready to leave.
(d) Buyer shall be responsible for the transportation to and from the Cove Point
pier of (i) LNG tanker crews and other personnel associated with the LNG
tankers; (ii) ships' stores and other goods and equipment needed by the LNG
tankers; (iii) liquid nitrogen; (iv) LNG tankers' garbage and refuse; and (v)
all other requirements of the LNG tankers. Bunkering of LNG tankers will not
be permitted at the Cove Point terminal.