Cove Point LNG Limited Partnership

Second Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 06/01/2003, Docket: CP01- 76-003, Status: Effective

Fourth Revised Sheet No. 7 Fourth Revised Sheet No. 7 : Effective

Superseding: Second Revised Sheet No. 7

 

CURRENTLY EFFECTIVE RATES

FUEL RETAINAGE FACTORS

 

 

 

Retainage Factors(1)

Injection Withdrawal Section 5(h)

--------- ---------- ------------

Rate Schedule FPS-1 (2) 1.0% 2.0% 2.6%

Rate Schedule FPS-2 (2) 1.0% 2.0% 2.6%

Rate Schedule FPS-3 (2) 1.0% 2.0% 2.6%

Rate Schedule FTS 0.0% 0.0%

Rate Schedule ITS 0.0% 0.0%

Rate Schedule LTD-1 1.0% 2.0%

Rate Schedule LTD-2 1.0% 2.0%

 

 

 

 

(1) Operator shall retain a quantity of natural gas equivalent to the stated percentage factor

multiplied by the quantity of natural gas received for transportation or storage.

Retainage is calculated based upon the actual transportation fuel used in accordance with

Section 1.41 of the General Terms and Conditions.

 

(2) Fuel required for liquefaction will be allocated only to Rate Schedule FPS. The fuel

required for liquefaction is calculated based upon the actual fuel used in accordance with

Section 1.41 of the General Terms and Conditions.