CNG Transmission Corporation
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 01/05/1998, Docket: CP96-492-008, Status: Effective
Fourth Revised Sheet No. 346 Fourth Revised Sheet No. 346 : Superseded
Superseding: Sub. Third Revised Sheet No. 346
GENERAL TERMS AND CONDITIONS
FERC Annual Charge Adjustment
Such adjustment shall be the ACA unit charge, adjusted to
the Pipeline's pressure base and heating value, if
required, which is specified by the Federal Energy
Regulatory Commission each year to recover its costs for
its previous fiscal year. The Annual Charge Adjustment
shall be reflected on Sheet Nos. 31, 32, 33, and 35 of this
Tariff and applicable sheets in Volume No. 2 of Pipeline's
FERC Gas Tariff. By electing the FERC ACA unit charge
method of recovery, Pipeline hereby acknowledges its intent
not to recover any annual charges recorded in FERC Account
No. 928 in any general rate proceeding filed under Section
4(e) of the Natural Gas Act.
14.3 Filing Procedure. The initial Annual Charge Adjustment or
any subsequent changes in such assessment charge shall be
filed by the Company at least thirty (30) days prior to the
proposed effective date, unless, for good cause shown, a
lesser notice period and different effective date is
allowed by valid Commission order. The proposed effective
date of filings shall be October 1 of each calendar year.
15. TRANSPORTATION COST RATE ADJUSTMENT ("TCRA")
The rates and charges applicable to Rate Schedules FT,
FTNN, IT, GSS, GSS-II, MCS and any other service for which
Pipeline designs rates as a derivative of any of the above
stated Rate Schedules (the "Applicable Rate Schedules")
are subject to adjustment to reflect changes in
Transportation Costs, unrecovered fuel costs as
determined in Section 16, and electric power costs as
determined in Section 17. "Transportation Costs" are costs
incurred by Pipeline as described in Section 15.7 for the
Transmission and Compression of Gas by Others, Account No.
858, but shall not include costs that Pipeline recovers
pursuant to Section 18.2.B. of the General Terms and
Conditions of this Tariff.
15.1 Filing of Transportation Cost Rate Adjustment. The
effective Transportation Cost Rate Adjustment under the
Applicable Rate Schedules included in Pipeline's FERC Gas Tariff
shall be shown on Pipeline's Tariff Sheet Nos. 31, 32, 33, and 35
in this Volume No. 1, and other applicable tariff sheets. The
effective date of each Transportation Cost Rate Adjustment shall
be on November 1 and April 1 of each year. Pipeline shall also
be entitled to make