Quality
3. shall not contain more than seven pounds of water
in vapor phase per one million cubic feet.
B. Appalachian Wet Gas System. The facilities classified
as Pipeline's Wet Gas System are shown in Pipeline's
FERC Gas Tariff, Original Volume 1A, beginning at
Sheet No. 10. Gas received by Pipeline at Receipt
Points in Pipeline's Wet Gas System:
1. shall have a Total Heating Value which is not
less than 1100 Btu per cubic foot; and
2. shall be free of water and hydrocarbons in liquid
form at the temperature and pressure at which the
gas is delivered; and
3. shall not (a) contain water vapor in excess of
the quantity required for saturation of the gas
at the temperature and pressure of the gas in
Pipeline's facilities; or (b) contain more than
twenty pounds of water in vapor phase per one
million cubic feet, if gas is received by
Pipeline on the discharge side of Pipeline's
field transmission stations.
C. Dry Gas System. The facilities classified as
Pipeline's Dry Gas System are shown in Pipeline's FERC
Gas Tariff, Original Volume 1A, beginning at Sheet No.
10. Gas received by Pipeline at Receipt Points in
Pipeline's Dry Gas System shall be free of water and
hydrocarbons in liquid form at the temperature and
pressure at which the gas is delivered, and shall not
contain any hydrocarbons which might condense to free
liquids in Pipeline's system under normal conditions;
and
1. if the gas is received from a well which was
connected to Pipeline's system on November 2,
1992 under the terms of a gas purchase contract
or transportation agreement:
a. shall not contain water in vapor in excess
of the quantity required for saturation of
the gas at the temperature and pressure of