CNG Transmission Corporation

Second Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 01/01/1998, Docket: RP97-406-000, Status: Effective

Second Revised Sheet No. 183 Second Revised Sheet No. 183 : Superseded

Superseding: Substitute First Revised Sheet No. 183

OSS RATE SCHEDULE

Open Access Storage Service

 

I. Any other applicable rates, charges, and penalties

as set forth in the General Terms and Conditions of

Pipeline's Tariff.

 

5.2 Fuel Retention. Pipeline will retain the percentage of

gas received for injection set forth on Sheet No. 36 as

the Storage Service Fuel Retention Percentage.

5.3 In the event Customer has failed to meet the minimum

turnover requirements of Section 8.7 below, Pipeline

shall retain the quantity of gas required by Section

12.4 below.

5.4 Notwithstanding the general provision of Sections 4 and

5.1, above, if Pipeline and Customer mutually agree to

negotiated rates for service hereunder, such negotiated

rates shall apply in lieu of the otherwise applicable

charges identified in Sections 5.1.A through 5.1.G of

this Rate Schedule.

 

6. MINIMUM MONTHLY BILL

Unless Pipeline and Customer agree otherwise as provided

in Section 5.4, above, the minimum monthly bill shall be the

sum of (1) the Storage Demand Charge and the Storage Capacity

Charge, or (2) the Storage Use Charge, whichever is

applicable, and any other applicable charges as set forth in

the General Terms and Conditions of Pipeline's Tariff.

 

7. INJECTIONS INTO STORAGE

7.1 Receipt Points. The executed Service Agreement shall

specify the Receipt Point(s) for quantities tendered by

Customer to Pipeline for storage injection.

7.2 General Procedure. For any Day when Customer desires

Pipeline to store gas for its account under this Rate

Schedule, it shall nominate to Pipeline in accordance

with the General Terms and Conditions of this Tariff,

specifying the quantity of gas it desires to have

injected into storage on such Day. When Customer's

nominations are confirmed and scheduled as required by

this Tariff, Pipeline shall inject into storage for

Customer's account on such Day, the quantity of gas so

nominated, subject to the limitations set forth below in

this Section 7.

7.3 Notice Required. Except as provided in Section 9 of

Rate Schedule FTNN, the notice given by Customer to

Pipeline for injections on any Day shall be that

required for nominations under Section 11A of the

General Terms and Conditions.